Puspita, Dira Tri and Putranto, Lesnanto Multa and Sarjiya, Sarjiya (2025) Optimizing Operational Strategies for Coal-Fired Power Plants Integrated with PV and Energy Storage: a Case Study of BESS and TSPP. International Conference on Technology and Policy in Energy and Electric Power (ICT-PEP). 1- 6.
Optimizing_Operational_Strategies_for_Coal-Fired_Power_Plants_Integrated_with_PV_and_Energy_Storage_a_Case_Study_of_BESS_and_TSPP.pdf - Published Version
Restricted to Registered users only
Download (1MB) | Request a copy
Abstract
Indonesia's electricity sector is still dominated by Coal-Fired Power Plants (CFPP) which produce high carbon emissions. To support a 28 renewable share by 2038 and harness Indonesia's solar potential, a Mixed Integer Linear Programming (MILP) daily Unit Commitment (UC) model was developed. Three scenarios were simulated: conventional generation only, integrating PV with Battery Energy Storage System (BESS), and integrating PV with Thermal Storage Power Plant (TSPP). The conventional baseline incurs a total daily cost of 320,931.71 USD, while adding PV and BESS raises cost to 384,237.52 USD, due to high capital outlays and round-trip losses, and adding PV with TSPP lowers cost to 380,218.61 USD, demonstrating its economic advantage despite lower efficiency. BESS handles 262.57 MWh of output PV and produce 236.99 MWh, whereas TSPP with the same output PV, produce 96.41 MWh. However, TSPP can be an alternative solution for energy storage because it offers lower investment cost per capacity and longer service life, yielding a more competitive Levelized Cost Of Energy (LCOE) over the long term.
| Item Type: | Article |
|---|---|
| Additional Information: | Cited by: 0 |
| Uncontrolled Keywords: | Costs; Economics; Electric energy storage; Heat storage; Investments; Mixed-integer linear programming; Solar energy; Battery energy storage systems; Coal-fired power plant; Energy; Integer Linear Programming; Mixed integer linear; PV; Storage power; Thermal storage; Thermal storage power plant; Unit Commitment; Integer programming |
| Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering T Technology > TK Electrical engineering. Electronics Nuclear engineering > Production of electric energy or power. Powerplants. Central stations |
| Divisions: | Faculty of Engineering > Electrical and Information Technology Department |
| Depositing User: | Rita Yulianti Yulianti |
| Date Deposited: | 04 May 2026 01:26 |
| Last Modified: | 04 May 2026 01:26 |
| URI: | https://ir.lib.ugm.ac.id/id/eprint/24767 |