Sarjiya, Sarjiya and Budi, Rizki Firmansyah Setya and Hadi, Sasongko Pramono (2019) Delay Risk Mitigation of Generation Expansion Planning Implementation in the Deregulated Market based on Game Theory Approach. In: 11th International Conference on Information Technology and Electrical Engineering, 2019.
Delay_Risk_Mitigation_of_Generation_Expansion_Planning_Implementation_in_the_Deregulated_Market_based_on_Game_Theory_Approach.pdf
Restricted to Registered users only
Download (153kB) | Request a copy
Abstract
Delay on power plant constructions is a big problem in Ambon power system. Independent power producer (IPP) is an alternative solution to mitigate the risk of delays. The using of IPP makes the electricity market in Ambon power system becomes a deregulated market. So, before determining the IPP as the expansion power plants in Ambon power system, it is necessary to analyze the interest of investors to invest in the deregulated market (Ambon power system). The research's purpose is to mitigate the delay risk of GEP implementation by IPP. This research carried out an investor interest analysis so it can be determined which power plants can be built by IPP and which ones must be handled by PLN. This research used modification of game theory method to analyze the investor interest in Ambon system. The research result showed that IPP solution is impossible because they are not interested. All power plants will be built by PLN. The alternative solutions to minimize the delay risk are utilizing capital market, increasing the ability of PLN to generate internal funds, and developed a project finance model where EPC contractors also give a portion on project funding.
| Item Type: | Conference or Workshop Item (Paper) |
|---|---|
| Additional Information: | Library Dosen |
| Uncontrolled Keywords: | Budget control; Commerce; Compensation (personnel); Deregulation; Electric utilities; Investments; Power plants; Alternative solutions; Deregulated markets; Generation expansion planning; GEP delay; Independent power producers; limited PLN budget; Power plant construction; Research results; Game theory |
| Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
| Divisions: | Faculty of Engineering > Electrical and Information Technology Department |
| Depositing User: | Sri JUNANDI |
| Date Deposited: | 04 Mar 2026 01:46 |
| Last Modified: | 04 Mar 2026 01:46 |
| URI: | https://ir.lib.ugm.ac.id/id/eprint/25138 |