Major blocking factors affecting the application of industrialized building system

Al-Aidrous, Al-hussein M. H. and Shafiq, Nasir and Rahmawati, Yani and Mohammed, Bashar S. and Al-Ashmori, Yasser Yahya and Baarimah, Abdullah O. and Alawag, Aawag Mohsen (2023) Major blocking factors affecting the application of industrialized building system. AIN SHAMS ENGINEERING JOURNAL, 14 (10). pp. 1-13. ISSN 2090-4479

[thumbnail of 1-s2.0-S2090447923000400-main.pdf] Text
1-s2.0-S2090447923000400-main.pdf - Published Version
Restricted to Registered users only

Download (924kB) | Request a copy

Abstract

Industrialized construction continues to emerge globally. Developing countries like Malaysia are still unable to increase industrialized building system (IBS) implementation significantly, demonstrated by the low IBS percentage of less than 3%. Therefore, this research aims to determine the factors blocking IBS implementation through a mixed-methodological approach in the Malaysian construction industry. Using the data collected from 219 valid questionnaire responses, several statistical analyses were per-formed. Factor analysis was used to categorize the 25 factors into six main groups namely: ``financial con-cerns,'' ``ineffective policies,'' ``technical and management worries,'' ``traditional stakeholders' concerns,'' ``design restrictions'' and ``negative perception''. The top three critical factors are high initial capital cost, high initial cost of customized design, and transportation cost. Hence, adopting an innovative standard-ized design concept and increasing IBS manufacturers nationwide are recommended. The findings pro-vide a useful guide to critical blocking factors and, thus, develop feasible solutions to achieve successful implementation of industrialized buildings.(c) 2023 THE AUTHORS. Published by Elsevier BV on behalf of Faculty of Engineering, Ain Shams Uni-versity. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/ by-nc-nd/4.0/).

Item Type: Article
Uncontrolled Keywords: Off-site construction; Critical factors; Challenges; Barriers; Sustainable building; Prefabrication
Subjects: T Technology > TH Building construction
Divisions: Faculty of Engineering > Architecture Engineering & Planning Department
Depositing User: Rita Yulianti Yulianti
Date Deposited: 06 Nov 2024 00:31
Last Modified: 06 Nov 2024 00:31
URI: https://ir.lib.ugm.ac.id/id/eprint/10309

Actions (login required)

View Item
View Item