Development of Lean Implementation Framework for Indonesian Batik Small and Medium-Sized Enterprises

Rochman, Y.A. and Sudiarso, A. and Herliansyah, M.K. (2024) Development of Lean Implementation Framework for Indonesian Batik Small and Medium-Sized Enterprises. International Journal of Engineering, Transactions B: Applications, 37 (11). 2223 – 2238. ISSN 1728144X

[thumbnail of Development_of_Lean_Implementation_Framework_for_I (1).pdf] Text
Development_of_Lean_Implementation_Framework_for_I (1).pdf - Published Version
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Small and Medium Enterprises (SMEs) face significant challenges in the global competitive market. An approach SMEs adopt to meet these challenges is implementing lean principles through the framework of lean implementation. Although some lean implementation frameworks have been introduced, previous research indicates that SMEs often need assistance applying this framework. This is caused by the need to adjust the lean implementation framework, which is considered limited by the resources owned by SMEs. Therefore, further research discusses adjusting the lean implementation framework and SME resources needed to improve operational performance. This study emphasizes the need for a lean implementation framework tailored to SMEs' scale and resources to reduce waste and improve operational efficiency. The lean implementation framework is developed by combining the lean implementation framework with the plan do check act (PDCA) approach and simulation to produce continuous improvements. The framework development stage evaluates the existing lean implementation framework based on previous research and SME resources. Furthermore, the framework that has been evaluated is grouped based on the plan, do, check, and action stages. This activity is carried out to ensure that lean implementation activities are a continuous improvement cycle. The final stage is adding simulation steps to the do and check stages to evaluate proposed improvements. The proposed framework was tested through a case study at Batik SME. The results showed the benefits and effectiveness of the proposed framework in the form of a 12.9-day reduction during work completion and an increase of 18.3 in the operator's utility. ©2024 The author(s).

Item Type: Article
Additional Information: Cited by: 0; All Open Access, Gold Open Access
Uncontrolled Keywords: Batik; Competitive markets; Continuous improvements; Enterprise resources; Lean implementation; Lean implementation framework; Plan do check action; Simulation; Small and medium-sized enterprise; Small-and-medium enterprise
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Faculty of Engineering > Mechanical and Industrial Engineering Department
Depositing User: Rita Yulianti Yulianti
Date Deposited: 19 Jun 2025 08:56
Last Modified: 19 Jun 2025 08:56
URI: https://ir.lib.ugm.ac.id/id/eprint/12851

Actions (login required)

View Item
View Item